Deliverables
Work Package 1
- D1.1 – Minutes of Kick-off Meeting (approved by the EU Commission)
[Click to read more] - D1.2 – Minutes of 1st Board Meeting (approved by the EU Commission)
[Click to read more] - D1.3 – Minutes of 2nd Board Meeting
- D1.4 – Minutes of 3rd Board Meeting
- D1.5 – Minutes of 4th Board Meeting
- D1.6 – Online Project Management Tools integrated in the SOLARNET webpage (approved by the EU Commission)
[Click to read more] - D1.7 – Implications of triggering Article 20.5
Work Package 2
- D2.1 – 1st Report on the activities of the EAST TAC and promotion of the Access programmes (approved by the EU Commission)
[Click to read more] - D2.4 – Minutes from Forum Meeting 1 (approved by the EU Commission)
[Click to read more] - D2.5 – Minutes from Forum Meeting 2 (approved by the EU Commission)
[Click to read more] - D2.11 Report on networking activities for instrumentation I (approved by the EU Commission)
[Click to read more] - D2.17 Report on the inventory of existing software and expressed needs for solar physics data tools (approved by the EU Commission)
[Click to read more] - D2.18 – Update on metadata recommendations for observational data (approved by the EU Commission)
[Click to read more] - D2.20- First report on metadata recommendations for simulation data (approved by the EU Commission)
[Click to read more]
Work Package 3
D3.3: First report on mobility programme (includes: reports issued by participating scientist) (approved by the EU Commission)
[Click to read more]
Work Package 4
- D4.1- Delivery of first version of SOLARNET website (approved by the EU Commissionl)
[Click to read more] - D4.2 Provide initial resources for training and outreach for consortium members (approved by the EU Commission)
[Click to read more] - D4.5 – Dissemination, Communication and Exploitation Plan (approved by the EU Commission)[Confidential – available to members of consortium only]
- D4.6 – Data Management Plan (approved by the EU Commission)
[Click to read more]
Work Package 5
- D5.6 – Assessment report of suitable CNN architectures (approved by the EU Commission)
[Click to read more] - D5.12 – Release of Basic Computational Tools and high-level analysis tools (approved by the EU Commission)
[Click to read more]
Work Package 6
- D6.1 – Image Slicer Design (approved by the EU Commission)
[Click to read more] - D6.2 – Report on the ability to manufacture thin glass slices (approved by the EU Commission)
[Click to read more] - D6.3 – Report on the ability to manufacture thin metallic slicers (approved by the EU Commission)
[Click to read more] - D6.7 – Field Splitter Design and Microlense Array Specifications (approved by the EU Commission)
[Click to read more] - D6.8 – Data reduction tool for single-field data [download code][approved by the EU Commission]
- D6.12 – Review of the scientific requirements of Narrow Band Imager (NBI) for EST (approved by the EU Commission)
[Click to read more]
Work Package 7
- D7.1 – Report on MCAO Prototype Opto-Mechanical Design (approved by the EU Commission)
[Click to read more] - D7.2 – Laboratory Integration and DM Test Report
- D7.3 – Prototype Lab Test Report
- D7.4 – Prototype Lab Test Report
- D7.5 – Simulation Results (approved by the EU Commission)
[Click to read more] - D7.6 – Neural Network Lab Integration and Test Report
- D7.7 – Neural Network On-Sky Integration and Test Report
- D7.8 – Report on PSF Estimation
- D7.9 – Report on Data Analysis and Transfer to WP 5
- D7.10 – Results of Turbulence Profile Comparison
- D7.11 – Turbulence Prediction: Report on Available Measurements (approved by the EU Commission)
[Click to read more] - D7.12 – Turbulence Prediction Report model geometry
- D7.13 – Turbulence Prediction Report on preliminary analysis of model performance
- D7.14 – Turbulence Prediction Final report on strategy for model calibration and validation
- D7.15 – Modular WFS Report on the preliminary opto-mechanical design of the demonstrator (approved by the EU Commission)
[Click to read more] - D7.16 – Modular WFS Report on hardware implementation and integration of the WFS prototype
- D7.17 – Modular WFS Report on laboratory tests
- D7.18 – Modular WFS Final report on system performances
- D7.19 – Combined Study Report on DM Cooling and Actuator Geometry
Work Package 8
- D8.1 – Report on optical and mechanical design of telescope and mounting
- D8.2 – Preliminary design for front-end telescope and mounting including schematics
- D8.3 – Design for post-focus instrumentation (Dopplergraph and magnetograph)
- D8.4 – Technical feasibility report on rationale and results of the quasi real-time Lucky-Imaging data-reduction pipeline at ROB
- D8.5 – Report on Demonstration Platform and results of Lucky-Imaging using multi-instrument data
- D8.6 – Software for Stokes inversion
- D8.7 – Report on preliminary design of GPU implementation of inversion code
- D8.8 – Software for data calibration, data merging
- D8.9 – Report on rationale and results of the data homogenization and multi-instrument flare detection developed and tested on archival data
- D8.10 – Report on data homogenization of SPRING prototype data and feedback to calibration sub-WP
Work Package 9
- D9.1 – 1st Periodic report on the Trans-National Access programme (approved by the EU Commission)
[Click to read more] - D9.2 – 2nd Periodic report on the Trans-National Access programme
- D9.3 – 3rd Periodic report on the Trans-National Access programme
Work Package 10
- D10.1 – Statistics of access provided 1 (approved by the EU Commission)
[Click to read more] - D10.2 – Statistics of access provided 2
- D10.3 – Statistics of access provided 3
- D10.4 – Assessment on virtual access 1 (approved by the EU Commission)
[Click to read more] - D10.5 – Assessment on virtual access 2
- D10.6 – Assessment on virtual access 3
Milestones
- MS1 Project Kick-Off (Achievement Date: January 24th, 2019)
- MS2 Consortium Agreement (Achievement Date: May 2nd, 2019)
- MS3 Project web site (Achievement Date: March 18th, 2019)
- MS4 Workshops on ‘Turbulence and Seeing’ and ‘Instrumentation’ (Postponed, dates to be decided)
- MS5 First science meeting (Postponed to September 2021)
- MS6 First week above the clouds (Achievement Date: August 9th, 2019)
- MS7 First school on spectro-polarimetry (Achievement Date: September 14th, 2019)
- MS10 Validation of the ability to manufacture thin metallic slices (Achievement Date: March 6th, 2020)
- MS17 Acceptance of 4 DMs (Postponed to January 2021)
- MS22 Post-focus instrument requirements defined (Postponed to April 2021).