Deliverables

Work Package 1

  • D1.1 – Minutes of Kick-off Meeting (approved by the EU Commission)
    [Click to read more]
  • D1.2 – Minutes of 1st Board Meeting (approved by the EU Commission)
    [Click to read more]
  • D1.3 – Minutes of 2nd Board Meeting
  • D1.4 – Minutes of 3rd Board Meeting
  • D1.5 – Minutes of 4th Board Meeting
  • D1.6 – Online Project Management Tools integrated in the SOLARNET webpage (approved by the EU Commission)
    [Click to read more]
  • D1.7 – Implications of triggering Article 20.5

Work Package 2

  • D2.1 – 1st Report on the activities of the EAST TAC and promotion of the Access programmes (approved by the EU Commission)
    [Click to read more]
  • D2.4 – Minutes from Forum Meeting 1 (approved by the EU Commission)
    [Click to read more]
  • D2.5 – Minutes from Forum Meeting 2 (approved by the EU Commission)
    [Click to read more]
  • D2.11 Report on networking activities for instrumentation I (approved by the EU Commission)
    [Click to read more]
  • D2.17 Report on the inventory of existing software and expressed needs for solar physics data tools (approved by the EU Commission)
    [Click to read more]
  • D2.18 – Update on metadata recommendations for observational data (approved by the EU Commission)
    [Click to read more]
  • D2.20- First report on metadata recommendations for simulation data (approved by the EU Commission)
    [Click to read more]

Work Package 3

D3.3: First report on mobility programme (includes: reports issued by participating scientist) (approved by the EU Commission)
[Click to read more]

Work Package 4

  • D4.1- Delivery of first version of SOLARNET website (approved by the EU Commissionl)
    [Click to read more]
  • D4.2 Provide initial resources for training and outreach for consortium members (approved by the EU Commission)
    [Click to read more]
  • D4.5 – Dissemination, Communication and Exploitation Plan (approved by the EU Commission)[Confidential – available to members of consortium only]
  • D4.6 – Data Management Plan (approved by the EU Commission)
    [Click to read more]

Work Package 5

  • D5.6 – Assessment report of suitable CNN architectures (approved by the EU Commission)
    [Click to read more]
  • D5.12 – Release of Basic Computational Tools and high-level analysis tools (approved by the EU Commission)
    [Click to read more]

Work Package 6

  • D6.1 – Image Slicer Design (approved by the EU Commission)
    [Click to read more]
  • D6.2 – Report on the ability to manufacture thin glass slices (approved by the EU Commission)
    [Click to read more]
  • D6.3 – Report on the ability to manufacture thin metallic slicers (approved by the EU Commission)
    [Click to read more]
  • D6.7 – Field Splitter Design and Microlense Array Specifications (approved by the EU Commission)
    [Click to read more]
  • D6.8 – Data reduction tool for single-field data [download code][approved by the EU Commission]
  • D6.12 – Review of the scientific requirements of Narrow Band Imager (NBI) for EST (approved by the EU Commission)
    [Click to read more]

Work Package 7

  • D7.1 – Report on MCAO Prototype Opto-Mechanical Design (approved by the EU Commission)
    [Click to read more]
  • D7.2 – Laboratory Integration and DM Test Report
  • D7.3 – Prototype Lab Test Report
  • D7.4 – Prototype Lab Test Report
  • D7.5 – Simulation Results (approved by the EU Commission)
    [Click to read more]
  • D7.6 – Neural Network Lab Integration and Test Report
  • D7.7 – Neural Network On-Sky Integration and Test Report
  • D7.8 – Report on PSF Estimation
  • D7.9 – Report on Data Analysis and Transfer to WP 5
  • D7.10 – Results of Turbulence Profile Comparison
  • D7.11 – Turbulence Prediction: Report on Available Measurements (approved by the EU Commission)
    [Click to read more]
  • D7.12 – Turbulence Prediction Report model geometry
  • D7.13 – Turbulence Prediction Report on preliminary analysis of model performance
  • D7.14 – Turbulence Prediction Final report on strategy for model calibration and validation
  • D7.15 – Modular WFS Report on the preliminary opto-mechanical design of the demonstrator (approved by the EU Commission)
    [Click to read more]
  • D7.16 – Modular WFS Report on hardware implementation and integration of the WFS prototype
  • D7.17 – Modular WFS Report on laboratory tests
  • D7.18 – Modular WFS Final report on system performances
  • D7.19 – Combined Study Report on DM Cooling and Actuator Geometry

Work Package 8

  • D8.1 – Report on optical and mechanical design of telescope and mounting
  • D8.2 – Preliminary design for front-end telescope and mounting including schematics
  • D8.3 – Design for post-focus instrumentation (Dopplergraph and magnetograph)
  • D8.4 – Technical feasibility report on rationale and results of the quasi real-time Lucky-Imaging data-reduction pipeline at ROB
  • D8.5 – Report on Demonstration Platform and results of Lucky-Imaging using multi-instrument data
  • D8.6 – Software for Stokes inversion
  • D8.7 – Report on preliminary design of GPU implementation of inversion code
  • D8.8 – Software for data calibration, data merging
  • D8.9 – Report on rationale and results of the data homogenization and multi-instrument flare detection developed and tested on archival data
  • D8.10 – Report on data homogenization of SPRING prototype data and feedback to calibration sub-WP

Work Package 9

  • D9.1 – 1st Periodic report on the Trans-National Access programme (approved by the EU Commission)
    [Click to read more]
  • D9.2 – 2nd Periodic report on the Trans-National Access programme
  • D9.3 – 3rd Periodic report on the Trans-National Access programme

Work Package 10

  • D10.1 – Statistics of access provided 1 (approved by the EU Commission)
    [Click to read more]
  • D10.2 – Statistics of access provided 2
  • D10.3 – Statistics of access provided 3
  • D10.4 – Assessment on virtual access 1 (approved by the EU Commission)
    [Click to read more]
  • D10.5 – Assessment on virtual access 2
  • D10.6 – Assessment on virtual access 3

Milestones

  • MS1 Project Kick-Off (Achievement Date: January 24th, 2019)
  • MS2 Consortium Agreement (Achievement Date: May 2nd, 2019)
  • MS3 Project web site (Achievement Date: March 18th, 2019)
  • MS4 Workshops on ‘Turbulence and Seeing’ and ‘Instrumentation’ (Postponed, dates to be decided)
  • MS5 First science meeting (Postponed to September 2021)
  • MS6 First week above the clouds (Achievement Date: August 9th, 2019)
  • MS7 First school on spectro-polarimetry (Achievement Date: September 14th, 2019)
  • MS10 Validation of the ability to manufacture thin metallic slices (Achievement Date: March 6th, 2020)
  • MS17 Acceptance of 4 DMs (Postponed to January 2021)
  • MS22 Post-focus instrument requirements defined (Postponed to April 2021).